theta-cost accounting for route 45 (job #1505), from Yang arXiv:2608.13299v2 Theorem 1.4 and its corollary (extraction lines 191-206, return #710/#711): lambda_q of level x^{L(nu)-theta-eps} with L(nu) = 1/4 + nu on 3/8 <= nu <= 1/2 and 1/2 + nu/2 on 1/2 <= nu <= 1; d ~ D = x^theta, 0 <= theta < nu. The carrier's modulus range (route 45 / #710): odd e <= Q = floor(x/y), y = ceil(x^{12/25}), i.e. level x^{13/25} = x^{0.52}. Constraint: theta + 0.52 <= L(nu) (the d-support is paid out of the q-level). theta = 0 : need L(nu) >= 0.520 -> any nu >= 3/8 (L(3/8) = 0.625) [no exchange support at all] theta = 1/5 : need L(nu) >= 0.720 -> nu >= 0.47 (L(0.47) = 0.720); theta < nu OK [#708's truncation D = x^{1/5}] theta = 13/25: need L(nu) >= 1.040 -> impossible (L(nu) <= 1) [d over the carrier's own range] Largest affordable d-support: theta <= L(nu) - 0.52, i.e. theta <= 0.105 at nu = 3/8, 0.23 at nu = 1/2, 0.48 at nu = 1. Which nu is available is condition (ii) of #710 (Lambda(dm-2) presented as l*p with l ~ x^nu), not decided here. Note: at N = 10^6, Q = 1317 and x^{1/5} = 15; the finite portrait cannot distinguish these levels; the constraint is exact bookkeeping, not a measurement.