T_29: D = 214708725 W = 6469693230 expected D = 214708725 W = 6469693230 #161 column: L(T_29, p) = 4 at 31, 3 at 29 and 37, 2 through 113, 1 from 127 on p L(T_29, p) #161 building the tile... 29 3 3 same 31 4 4 same 37 3 3 same 113 2 2 same 127 1 1 same 131 1 1 same 137 1 1 same 1009 1 1 same