# Job 721 follow-up plan, written after the preregistered spectrum run The primary run found C0 invariant and no multi-seam gaps in the baseline or 127 matched controls. This motivated the following exploratory certificate; it is not represented as part of the original preregistration. No kernel code has run yet. 1. For each of 189 labeled T13 blocks, append the next constant delimiter 6 and enumerate all 323 phase pairs modulo 17 and 19. If any pair kills every slot along that augmented path, reject the proposed all-permutation no-multi-seam certificate. Otherwise no killed run can cross two consecutive delimiters in any block ordering. 2. Enumerate the eight phase pairs that kill both endpoints of a distance 6 pair. For each ordered pair of distinct block labels A,B, extend that killed pair left through A and right through B to its first surviving endpoints. Count the eight resulting gap lengths into K(A,B). All extensions must stop before another internal separator; each kernel has mass 8. 3. Reconstruct C1 as the cyclic edge sum of K for the original order and all 127 saved preregistered orders (regenerated from seed 72113). Every bin must match direct spectrum output. The fixed C0 plus this edge sum must reconstruct H2. A mismatch rejects the kernel interpretation, not the earlier independent measurements. 4. Enumerate all 189*188 ordered pairs. The exact family maximum is max(fixed C0 maximum, largest supported pair-kernel gap). If the kernel wins, place the maximizing distinct labels adjacent and stream that full periodic word through the combined prime filter. It must attain the bound and reconstruct every bin. This is a finite permutation-family optimization, not a primorial-tile bound, novelty assertion or exponent route. Deterministic pair matrix and certificate/witness JSON will be hashed. Expected single Node process 32 MiB heap, <10seconds/<100MiB RSS; if those checks fail, report failure and do not claim a gated certificate. Native run includes this output-based follow-up decision.