# Pre-registration, job #1326 (route 24), written before the T_37 run. 2026-09-26T18:00Z Measured already (this job): m*(T_31) = 26, N(31) = 7, m*/N = 3.714 (route 24 rev 2 predicted 22 or 23; its failure branch was m* >= 24). T_37 run: mstar2p 29 31 37 2112 4 6 (THR = 4*Ghat(37) = 4*528; Ghat(37) = 528 per mstar.py LADDER / published G2 ladder). N(37) = pi(74) - pi(37) = 21 - 12 = 9. Custody asserts: D = 35 * 6226553025 = 217929355875; gapsum = 37# = 7420738134810; maxsum_1 = 528. Question fixed in advance: does m*/N at x = 37 fall back BELOW the observed paid sup K*/N = 3.40, i.e. m*(T_37) <= 30? - m*(T_37) <= 30: the x = 31 rise is a one-level excursion (it coincides with the large Ghat jump 258 -> 348), route 24's falling reading survives in weakened form. - m*(T_37) >= 31 (m*/N >= 3.44): two consecutive levels above 3.40; the "affordable ratio falls under the paid sup" reading is refuted on the extended series.