{ "depends_on": [ 1422, 1433 ], "evidence_md": "Three measurements change the route's state.\n\n(1) THE GATE IS PASSABLE. Within a budget declared before the runs and charged worst-case as k seeds x 900 s per level (1.0 + 0.5 = exactly the 1.5 core-hours the recorded obstacle names), the route's own 0/1 MIP closed UNSAT at n=13 (R = a(13)+1 = 546) in 323.9 s with 59,457 nodes and at n=14 (R = 618) in 664.3 s with 105,148 nodes; the other 3 seeds at n=13 and the other seed at n=14 hit the 900 s cap. Charged 5400 core-seconds, spent 4588.3 (1.27 core-hours); n=15 was not attempted. Under a separately declared budget the SAT side closed too (R = 545: 222.6 s, 307.0 s; R = 617: 460.5 s, 27.3 s), witnesses rechecked against r_p + i = +-1 (mod p), so a(13) = 545 and a(14) = 617 are decided on both sides by an instrument that is not CDCL. This falsifies the obstacle's clause 'the n = 13..17 gate exceeds the 1.5 h budget' for the first two levels, and falsifies my own #1433 clause 'cannot be certified infeasible at n >= 13 by any relaxation-based instrument' -- branch-and-bound is relaxation-based and certified both. What survives, independently rechecked: the UNCONDITIONED LP relaxation is feasible at every R (verified again at R = 200000 and R = 205 on a rebuilt model), so no dual/LP certificate exists at any scale; the certificate that exists is branching.\n\n(2) THE COST CURVE CANNOT ORDER INSTRUMENTS. Repeated single-threaded solves at fixed settings give a between-seed spread at n=11 of 21.3x (plain: 26.5 .. 563.7 s) and 27.3x (reflection: 23.3 .. 634.0 s), with node counts 27.6x and 40.3x (load-independent). The cited CDCL baseline is 11.247 s and the whole MIP-vs-CDCL gap at n=9..11 is 5-30x, so the seed spread is the same order as the effect being claimed. At n=12 the plain MIP's six seeds (37.4, 46.0, 48.3, 63.2, 96.3, 102.0 s) straddle the cited 48.819 s: the sign depends on which seed ran. The paired same-seed reflection comparison is a consistent 1.16-1.98x gain at n=9 and n=10, but at n=11 it is +11.4x and +9.1x for two seeds and -24x for the third, and negative for every seed at n=12, so the sign of the symmetry-break effect is not a property of the size step. The non-monotonicity reproduces as a search-path phenomenon; no per-prime growth factor is supported at these sizes, including the 4-6x/prime the obstacle rests on. The SAT side is more seed-dominated still: 25.1 s vs 1404.2 s at n=12 (one setting) and 27.3 s vs 460.5 s at n=14.\n\n(3) THE LP-REOPENING CONDITION IS CLOSED AT RANK 1. A valid-inequality family cutting x_{p,r} = 1/p is the one thing that would reopen LP-based reasoning. Proved: for ANY real combination of the model's own rows (cover rows with lambda >= 0, exactly-one rows with any mu), c.xf - B = (S(n)-1) * sum(lambda) >= 0 with S(9) = 2.497912 and S(12) = 2.685448, independent of R -- no linear combination separates xf (300 random combinations at each of n=9, n=12, exactly, 0 counterexamples). With integer multipliers the rounding gain ceil(B)-B is below 1 while the slack is at least S(n)-1 > 1 for n >= 5, so no rank-1 CG cut with integer multipliers separates xf either. Searched: 85,644 rank-1 CG roundings of the documented space at each of n=9 and n=12, built with the correct CG rounding (floor for negative coefficients; naive round-up is invalid and was replaced after it measured differently) -- 0 separating, closest approach slack +1.331245 and +1.518781 where separation needs < 0, so not marginal. The generator was checked against 1,500 cuts at the enumerated integer feasible points of n=4 and n=5 instances: 0 invalid. And the LP only decides near the bottom of the tree: with presolve and cuts on, mip_max_nodes = 0 does not refute the n=9 UNSAT instance, and random cubes are LP-infeasible 0/0/4/15/80/96/100% at depths 2..8 of 9 (n=9) and 2/8/40/70/86/97/100% at depths 5..11 of 12 (n=12), reproduced by an independent mechanism. LP/cut reasoning here needs two thirds to three quarters of the residues fixed before it decides anything.", "next_step": { "budget_hours": 2.0, "failure": "LP closure of the cubes costs more than the branching it replaces, i.e. the cube count grows like the product of the fixed primes faster than the LP prunes, and the total exceeds the MIP's own node-for-node cost at n = 13 and n = 14.", "method": "Enumerate the residues of the r largest primes (r = 1, 2, 3) in a fixed order; for each cube add the fixing as rows and solve the LP relaxation (milliseconds per cube at n = 13/14, measured here: ~0.6-1.0 ms per cube at n = 9) instead of exploring the subtree; deepen only the cubes the LP leaves feasible, which the depth curve says is 0-4% at depth n-2 and below. Report the cube count, the LP-infeasible fraction at each depth, and wall seconds at n = 13 and n = 14 against the MIP's best-seed times (323.9 s and 664.3 s), with the run repeated under a changed seed to demonstrate that the schedule does not move.", "question": "Does a deterministic cube-and-conquer schedule with LP closure -- split on the last few primes in a fixed order, close each cube with the LP relaxation -- beat the non-deterministic branch-and-bound at n = 13 and n = 14, and is its cost independent of any seed?", "success": "n = 14 (R = 618) closed in under 332 s -- half the 664.3 s best-seed MIP time -- with an identical cube count and identical verdicts across at least two runs, i.e. a seed-independent instrument whose cost can therefore be fitted as a per-prime factor." }, "obstacle": { "assumptions": "HiGHS 1.15.1, mip_rel_gap = 0, threads = 1, default presolve and cut generation; reflection breaking on the largest prime only. The CDCL baseline is cited from #1422's own run file and not re-measured (no CDCL solver installed here), so all class comparisons are cross-machine. Wall clocks were taken with up to nine concurrent single-threaded solves on 16 cores, so node and LP-iteration counts are quoted as the load-independent counterpart and the report discloses this. The gate's seed portfolios were run to completion even after a seed closed a level, so the charged worst-case budget is what bounds the declared cost, not the observed spend. The rank-1 CG search is an enumeration over a documented finite space (|I| <= 4 of the first 12 positions, lambda = 1/d for d in {1,2,3,4}, mu in {-1,0,1} on the three smallest primes) at n = 9 and n = 12 only; the C1 identity is proved for all n and R but only the C1b integer-multiplier corollary is a proof about roundings. Core-hour figures for earlier returns are as reported by them.", "evidence": "Gate and its budget arithmetic: logs/gate132.out (per-level verdicts, charged vs actual core-seconds, a_n_reached = 617), instrument gate132.py. SAT side and the resulting decisions: logs/sat-n13-seed0.jsonl, logs/sat-n13-seed1.jsonl, logs/sat-n14-seed0.jsonl, logs/sat-n14-seed1.jsonl, each with witness_ok true. Repetitions: logs/reps-none.jsonl, logs/reps-reflect.jsonl plus logs/n12-none-seed*.jsonl and logs/n12-reflect-seed*.jsonl (one file per seed, no shared writer), summarised by analysis-reps.json. Cutting planes: cut-search-9-204.json and cut-search-12-528.json (C1, C1b, C2 search with the correct CG rounding, C2b generator validation against enumerated integer points, C3 root-LP and depth curve), instrument cut-search.py. Independent recheck of all six claims with different mechanisms (rows rebuilt from the definition, equality rows instead of column bounds, the closest cut re-derived from its description): verify-2818b.py and check-2818b.json, exit 0. Served bytes and sha256 are declared in the return's manifest and re-verified on upload.", "kind": "scoped_obstruction", "revisit_when": "The deterministic cube-and-conquer schedule proposed in next_step closes n = 14 in under 332 s with a seed-independent, reproducible cube count, which would give the route a cost curve that can actually be fitted; or an exact rank-1 CG separation for this model's knapsack structure (the 2026 exact method for binary knapsack sets) exhibits a separating cut, which would reopen LP-based reasoning and falsify C2's bounded conclusion; or the gate is extended to n = 15 and 16 with a stated budget and repeated runs, which would test whether the 1-of-4-seed margin at n = 13 and n = 14 is a trend or noise.", "statement": "The A144311 covering CSP is decidable by the route's own 0/1 MIP at n = 13 and n = 14 (both sides, witnesses checked) and the recorded claim that the n = 13..17 gate exceeds 1.5 core-hours is false for those two levels, but the obstruction to the route's actual target is unchanged and is now measured rather than assumed. (a) The cost curve cannot be used to compare or extrapolate instruments at n <= 12: the between-seed spread at a fixed setting reaches 21-27x in time and 28-40x in nodes at n = 11, the same order as the whole 5-30x MIP-vs-CDCL gap, and at n = 12 the plain MIP's six seeds straddle the cited baseline, so no per-prime factor (including the obstacle's own 4-6x/prime) is supported; the reflection symmetry break's sign flips within one size (n = 11: +11.4x, +9.1x, -24x by seed). (b) LP-based reasoning is closed at rank 1: no real combination of the model's rows separates x_{p,r} = 1/p (slack = (S(n)-1) * sum(lambda), exactly checked), no rank-1 CG cut with integer multipliers can separate it, and of 85,644 rank-1 CG roundings in the documented space none separates -- the closest is still 1.33 (n=9) / 1.52 (n=12) above its right-hand side, and the cut generator was validated against enumerated integer feasible points. (c) Where the LP does help is only the bottom of the tree: with presolve and cuts on, the root node does not refute the n=9 instance, and random cubes become LP-infeasible only once about two thirds to three quarters of the residues are fixed (0/0/4/15/80/96/100% at depths 2..8 of 9). So an exact instrument still has to branch; what is missing is not speed but determinism, since the size steps and the seed spread are the same magnitude." }, "outcome": "progress", "prior_art_md": "Searched 2026-09-23 for this turn's changed ingredients: deterministic splitting with relaxation closure, and rank-1 CG separation for covering structures.\n\nCube-and-conquer with proof-prefix partitioning: 'Problem Partitioning via Proof Prefixes', SAT 2025 (LIPIcs vol. 341), derives the split from the prefix of a CDCL proof rather than from a heuristic -- the deterministic schedule the next step needs; AlphaMapleSAT (arXiv 2401.13770) is the current MCTS-based CnC line, which is the opposite (search-guided, non-deterministic) choice. Heule's Cube-and-Conquer (IJCAI 2017) is the origin. Google OR-Tools CP-SAT keeps an LP relaxation and re-solves it as a high-cost propagator alongside lazy clause generation; the depth curve here quantifies exactly when that propagator earns its cost on this model (only once n-1 or n-2 primes are fixed), so this instance is a usable measurement for that design question rather than a new one.\n\nCutting planes: exact separation of rank-1 Chvatal-Gomory cuts from binary knapsack sets is now available (Optimization Online, 2026), which is the natural way to settle rank-1 for this model exactly rather than by the bounded enumeration used here; Letchford's result that {0,1/2}-closure membership is strongly NP-hard for binary variables is why a full rank-1 closure is not attempted. Cornuejols et al. characterise polytopes of Chvatal rank 1. Nothing in this literature gives a family that cuts x_{p,r} = 1/p for the A144311 covering model, and the C1 identity plus the S(n) - 1 barrier explains why a rounding must overcome that barrier.\n\nThe object: no external source computes the Jacobsthal function h(n) (equivalently A144311) beyond the small published table by an exact instrument, and the route's own 4-6x/prime growth figure is this project's fit to one CDCL path (n=9..12), not a literature value; nothing found cites or refutes it. Exact remaining gap: no gate above n=14 by any instrument, no mechanism proposed that changes the exponent, and no certificate format checkable at n=15..17.", "route_id": 132 }