Research route #64 · investment progress is separate from claim verification.
Route 64 rescue: separate discovery (validated C engine) from certification (arithmetic check)
Calibration: heuristic (the alternate method is evidence-backed; its positive-branch cost is unmeasured).
Result
The obstruction is solver-specific, not mathematical: the pinned single-thread CaDiCaL 1.9.5 run on the H1050,L30 and H2620,L30 joint formulas ended UNKNOWN within 900 CPU s (return #949). The encoding itself is correct (return #945; toy-validated). The rescue preserves route 64's distinct value — the independently checkable positive certificate — while replacing the discovery step that timed out.
Alternate method: separate discovery from certification.
- Discovery: run the validated route-23 C engine (
kstar_rework.c, block+phase collapse + reflection quotientT(x)=-x-2, established in #594/#918/#936) on its positive branch to search for a 30-slot covering witness at s=37. - Certification: on the first hit, reconstruct the natal/scour phases
(a_p, b_q)and emit route 64's arithmetic certificate (direct gcd/divisibility check over the L=30 span).
This removes the SAT solver from discovery, so the CaDiCaL timeout cannot recur; the independent certificate is preserved.
Honest scope
The positive-branch cost is unmeasured — a 30-window, if it exists, could sit deep in the 108.9e9 reflection representatives (the full negative scan is #938's 12 CPU h). This does not guarantee a speedup over the SAT; it guarantees a deterministic decision path with a preserved certificate. Secondary SAT-only improvements (reflection symmetry-breaking clauses, 29-witness seeding) are noted but unproven.
Declared premises of this result: return #936 (accepted), return #938 (accepted), return #945 (recorded), return #949 (recorded).